TYCHY CITY MUNICIPALITY


Project “Construction of the computer network for the centralisation of services for the City of Tychy”.

The scope of the project has been defined in the Contract, which indicates its scope as follows:

  • Refurbishing structured cabling in the building of the Tychy City Hall,
  • Rearranging the server rooms,
  • Delivering brand new network and firewall equipment, including the dismantling of network equipment replaced with new equipment, and installing and configuring the equipment in the Client’s environment,
  • Delivering software licences and installing and configuring software to monitor, manage and ensure security in the network and to keep and analyse logs,
  • Creating new stations for infrastructure management,
  • Configuring and implementing all components of the new network.

The deliverables under the Contract were implemented at the following locations:


  • Tychy City Hall – al. Niepodległości 49,
  • Archives of the Tychy City Hall – ul. Nowokościelna 11,
  • Little Theatre in Tychy – ul. Hlonda 1,
  • Municipal Public Library in Tychy – al. Piłsudskiego 16,
  • Municipal Educational Centre in Tychy – al. Piłsudskiego 12,
  • Regionalne Centrum Gospodarki Wodno-Ściekowej S.A. – al. Piłsudskiego 12,
  • Municipal Nursery in Tychy – ul. Grzegorza Fitelberga 4,
  • Shared Services Centre of the City of Tychy – ul. Edukacji 7,
  • County Building Control Authority in Tychy – ul. Grota Roweckiego 42,
  • ICT Security Centre – al. Niepodległości 230,
  • Municipal Police – ul. Budowlanych 67,
  • Municipal Social Welfare Centre in Tychy – ul. Budowlanych 59,
  • County Labour Office in Tychy – ul. Budowlanych 59,
  • Transport Department of the Tychy City Hall – ul. Budowlanych 59,
  • Municipal Streets and Bridges Authority – ul. Budowlanych 59,
  • County Disability Evaluation Team in Tychy – ul. Budowlanych 59,
  • Department of Environmental Protection of the Tychy City Hall – ul. Budowlanych 67,
  • Tychy Municipal Services Company – ul. Budowlanych 43,
  • Municipal Police – ul. Asnyka 1,
  • Shared Services Centre of the City of Tychy – ul. Barona 30
  • Social Affairs and Health Department of the Tychy City Hall – ul. Barona 30
  • Audit Department of the Tychy City Hall – ul. Barona 30
  • Municipal Heritage Conservation Officer of the Tychy City Hall – ul. Barona 30
  • Municipal Consumer Ombudsman of the Tychy City Hall – ul. Barona 30
  • Free Legal Assistance Centre – ul. Barona 30
  • Construction Department of the Tychy City Hall – ul. Barona 30

The following items were delivered under the contract:


  • CORE switch – 4 pcs.
  • PPD switch – 23 pcs.
  • TOR switch – 13 pcs.
  • SAN switch – 2 pcs.
  • GBIC (SFP/SFP+) modules – 192 pcs.
  • MAN switch – 47 pcs.
  • Firewall at the City Hall – 2 pcs.
  • Firewall at remote external units – 7 pcs.
  • Infrastructure administration system
  • Virtualisation system – 2 pcs.
  • SAN disk array
  • Server operating system – for virtualisation servers
  • Access control system
  • System for network monitoring and management and log collection and analysis
  • Large-screen displays
  • Mini-workstations
  • Laptops for administrators

The implementation included the following:


  • Refurbishment of structured cabling – PPD
  • Expansion of copper cabling – LAN
  • Refurbishment of fibre-optic cabling in the server room – GPD
  • Network cabinet replacement
  • Relocating physical server resources in RACK cabinets
  • Rearranging server cabling
  • Readdressing physical and virtual servers
  • Refurbishing a core switch – GPD
  • Refurbishing switches as distribution points – PPD
  • Refurbishing switches in server cabinets – TOR
  • Installing SAN switches
  • Logical rearrangement of the LAN
  • Readdressing workstations
  • Delivering GBIC modules (SFP/SFP+)
  • Replacing switches in external units
  • Refurbishing the Firewall in the City Hall
  • Delivering a Firewall for remote External Units
  • Network access control system
  • System for network monitoring and management and log collection and analysis
  • Refurbishing the SSC Administrator room
  • Training SSC Administrators – network infrastructure administration
  • Training SSC Administrators – implemented administration tools
  • Training SSC Administrators – Firewall equipment administration
  • Post-implementation training
  • Acceptance tests, as-built documentation

Implementation period: 1/2020 to 8/2020

Value of the completed project: PLN 2,923,341.00 gross